ICW Drawbridge · Statute Mile 845

George Musson Memorial (formerly known as Coronado Beach) Bridge

Bascule (drawbridge) on the Atlantic Intracoastal Waterway in Florida · hail VHF 09.

Checking…
Live next opening

Bridge facts

WaterwayAtlantic Intracoastal Waterway (AICW)
ICW statute mile845
StateFlorida
TypeBascule (drawbridge)
Vertical clearance22 ft (6.71 m) closed; opens for taller vessels
VHF hailing channelChannel 09
Opening behaviourOn signal · restricted
Regulation33 CFR 117.261

Opening schedule

The draw shall open on signal, except that from 7 a.m. to 7 p.m., the draw shall open on the hour and half-hour, seven days a week. (33 CFR 117.261)

In plain English: Opens on signal (on demand). Restricted: daily 7 a.m.–7 p.m., it need only open on the hour and half-hour.

Frequently asked

When does George Musson Memorial (formerly known as Coronado Beach) Bridge open?

Opens on signal (on demand). Restricted: daily 7 a.m.–7 p.m., it need only open on the hour and half-hour.

What VHF channel does George Musson Memorial (formerly known as Coronado Beach) Bridge use?

George Musson Memorial (formerly known as Coronado Beach) Bridge monitors VHF Channel 09 for bridge openings on the Intracoastal Waterway.

How much clearance does George Musson Memorial (formerly known as Coronado Beach) Bridge have?

About 22 ft (6.71 m) when closed; it opens for taller vessels.

Where is George Musson Memorial (formerly known as Coronado Beach) Bridge on the ICW?

George Musson Memorial (formerly known as Coronado Beach) Bridge is at Intracoastal Waterway statute mile 845 in Florida.

← North · toward Norfolk
Dunlawton Avenue Bridge
ICW mi 835.5
South · toward Miami →
Harris Saxon (New Smyrna) Bridge
ICW mi 846.5

See the next opening on every fix

Sealink shows the live drawbridge countdown, your distance and ETA, and whether the span must open for your air draft — automatically, on every position update. Free, all features, no card.

Sign Up Free How Nearby Bridges works